UK nation · Northern Ireland
Energy-efficiency in Northern Ireland.
Northern Ireland's energy mix differs from the rest of the UK: most homes still rely on home heating oil rather than mains gas, and electricity prices are typically higher per kWh. That makes air-source heat pumps and solar PV particularly impactful here — the saving against an oil boiler is usually larger than the saving against gas in Great Britain. Pre-1919 stock is concentrated in Belfast and the linen-mill towns; rural housing tends to be 1960s-1980s detached. OMEGA crews install across Northern Ireland directly; free survey usually 2–3 days, never more than a week.
A local crew, usually within the fortnight.
Homes on oil heating
~64%
Pre-1919 housing stock
~14%
Devolved grant scheme
Affordable Warmth
Surveyor wait time
Within a week
Funding routes in Northern Ireland
Three live grant routes — we check every one on the survey.
Northern Ireland runs its own devolved energy-efficiency scheme alongside the UK-wide grants. Most homeowners qualify for at least one — and don't know it. We check eligibility on the free survey, file the paperwork in our name, and tell you in writing which routes apply and how much they could be worth.
Affordable Warmth Scheme
Northern Ireland's targeted fuel-poverty scheme — administered through the Northern Ireland Housing Executive and local councils. Up to £7,500 of energy-efficiency measures (insulation, heating upgrades, draught-proofing) for eligible owner-occupiers and private renters earning under a set income threshold. We check what applies on the survey.
Boiler Replacement Allowance
Northern Ireland-specific scheme paying up to £1,700 toward replacing an inefficient boiler with a high-efficiency condensing boiler. Subject to eligibility (income threshold and existing boiler age). We confirm what applies to your home.
Boiler Upgrade Scheme
The UK-wide BUS heat-pump grant runs in NI as well — up to £7,500 off an air-source heat pump and £7,500 off a ground-source unit. Particularly powerful here because most homes are switching from heating oil, where the saving is the largest in the UK.
Where we are in Northern Ireland
Honest about the lead time.
We work just as hard in Northern Ireland as anywhere else we install. Free survey from any BT postcode usually 2–3 days, never more than a week; install scheduled within four to six weeks of plan sign-off depending on access. Same five guarantees, same 25-year cover, same OMEGA-payroll engineer on the phone in year four.
Certified, audited, accountable
The bodies that let us do this work in Northern Ireland.
MCS · PAS2030 · PAS2035 · HIES — the registers required by every Northern Ireland grant scheme we work with.

TrustMark
The UK national quality mark for home improvement work

SafeContractor
Health & safety competence accreditation

BBA Certified
British Board of Agrément product certification

Kiwa Certified
Independent third-party product certification

25-yr IBG
25-year insurance-backed guarantee

Workmanship Warranty
Five years on the labour, parts and call-outs on every install
Every accreditation is checkable on the issuing register
Book a free £495 home energy survey in Northern Ireland.
We walk every room, check every active Northern Ireland grant route, and write you a 12-page plan with the prices and the funding routes that apply to your house. £495 of work. Yours to keep, even if you never call us again.
The plan is yours to keep. Take it to two other installers if you like.
25-year product warranty. 5-year workmanship guarantee. Both insurer-backed. If we vanished tomorrow, your cover still pays out.