Skip to main content

Live · the OMEGA retrofit

Watch your home, fully retrofitted with multifoil

One cinematic minute. Same house — your house — at every stage of the OMEGA retrofit. Click any chapter to jump. Tap the speaker to hear it.

OMEGA retrofit — completed install, photographed on site.
Where you are today.
Energy loss72%
Saved / yr£0
A house that takes more than it gives.
0:00 / 0:40

Home energy upgrades

Multifoil insulation — when 40mm beats 200mm

More than 20 layers of reflective foil and foam, 40mm or 80mm thick depending on where it's going. It outperforms 200mm of mineral wool because it reflects radiant heat back into the room rather than just slowing it down. In the right wall it transforms the home. In the wrong wall it traps moisture. The U-value calculation comes before the install, every time.

  • Surveyed first

    designed from heat-loss numbers, not a postcode estimate

  • Within the week

    survey usually booked in 2–3 days, plan in writing 48 hours later

  • Your surveyor

    MCS-certified, employed by OMEGA — not subcontracted

The plan is yours to keep. Take it to two other installers if you like.

OMEGA multifoil install

Installed by OMEGA's own teams across the United Kingdom.

Live · 2026 install figures

The numbers, at a glance.

Typical figures for a 3-bed UK home. Your real numbers come in writing within 48 hours of a free home survey.

Indicative cost

FROM

£1,800

/ £85 a month after ECO4

Average yr-1 saving

£640

/yr

Install time (typical)

1

–3 days

Typical U-value achieved

0.18

–0.22 W/m²K

Build-up depth (incl. air gaps)

30

–50mm

Lambda (declared, BBA tested)

0.034

–0.038 W/mK

Radiant heat reflection

>

95%

Product guarantee

50years

(BBA-backed)

Workmanship guarantee

5years

(OMEGA, insurer-backed)

Accreditation

PAS2030 · TrustMark · BBA

About this service

Multifoil, designed properly.

Multifoil is what we recommend on most homes we survey. It is a reflective laminate — more than 20 layers of foil and engineered foam, 40mm or 80mm thick depending on the application — that outperforms 200mm of mineral wool. It does so by reflecting radiant heat back into the room rather than just slowing it down. About two-thirds of the heat lost through a typical UK ceiling or roof line is radiant; mineral wool catches very little of it, multifoil catches almost all of it. The fact that it does this in 40mm rather than 200mm is the reason it works where old-school insulation cannot — converted lofts with no head room, internal walls where you cannot lose floor space, solid-wall homes whose owners do not want to lose a wing of the living room to insulation. We fit it under rafters, behind dot-and-dab on cold external walls, and — most powerfully — externally on solid-walled homes, where 80mm of multifoil wraps the whole house and a waterproof cladding panel goes on top. The cladding finishes the system and protects the foil. It's the strongest fabric upgrade we fit, and unlike spray foam it leaves the roof timbers visible and the home mortgageable. PAS 2030-accredited install. 50-year product warranty on the foil. 10-year warranty on the cladding system. Both insurer-backed.

What independent experts say

Public Guidance · OMG-021

Centre for Sustainable Energy

In almost all cases, installing spray foam insulation carries considerable risks.

Originally published 2026UK national charityOMEGA verified 12.05.26

What you get

  • Up to 170mm thinner than equivalent mineral wool build-ups — preserves head height in conversions and bungalows
  • Reflects greater than 95% of radiant heat back into the room (radiant heat is roughly 60–70% of total loss through a pitched roof)
  • BBA-certified systems with named certificate numbers on every quote — no generic claims, no marketing-grade U-values
  • Built-in vapour-control membrane — eliminates the separate VCL most installers forget on a cold-roof retrofit
  • Lambda values published in independent test data — typically 0.034–0.038 W/mK on the certified products we install
  • 50-year product guarantee from the manufacturer, 5-year installation guarantee from OMEGA on top
  • Air-gap-aware fitting protocol — we measure and verify the manufacturer-required air gaps before plasterboarding (the failure mode that sinks 80% of bad multifoil installs)

See the numbers

Multifoil — costs and savings, fitted for your home

Live tool, Q2 2026 prices. Slide through property size for an honest instant estimate — your real quote will come in writing within 48 hours of a free survey.

OMEGA multifoil install — laminate fitted between rafters with the air gap visible. Photographed on site.
Live · multifoil thermal model
97%Radiant reflected
45mmTotal stack
0.18U-value target
+150mmHeadroom reclaimed
Multifoil reflects up to 97% of radiant heat back into the loft space. 45mm stack hits the same U-value as 200mm of mineral wool.

How it works

How it works, step by step.

  1. 01

    Free home survey (45 minutes)

    Our surveyor measures rafter depth, ventilation paths, the existing insulation thickness, and the room-in-roof build-up — looking specifically for the air gap and ventilation conditions multifoil needs to perform. Thermal imaging on request, no extra cost. If multifoil is wrong for your home, you will hear it on the day.

  2. 02

    Layered specification (in writing, on the quote)

    We design the build-up layer by layer: rafter, ventilation gap, multifoil product (named, with BBA certificate number), counter-batten depth, plasterboard. Every layer appears on your quote. The U-value calculation appears on your quote. The air-gap dimensions appear on your quote.

  3. 03

    Installation (1–3 days typical, lead installer named on day one)

    PAS2030-accredited team of two — never subcontracted, lead installer is your single point of contact. Day one: foil layered between rafters with the correct tensioned air gaps above and below, overlaps taped to manufacturer specification. Day two (where applicable): counter-battens fixed at the depth our quote specifies, plasterboard up. We measure each air gap before any board goes on. Most loft-only jobs are done in a single visit, before lunch.

  4. 04

    Certification, guarantees, EPC lodged

    TrustMark certificate, 50-year product guarantee from the manufacturer, 5-year workmanship guarantee from OMEGA, and an updated EPC lodged within 30 days. The thermal imaging report (if you wanted one at survey) gets revisited six months in to verify performance — at no extra cost.

Accreditations that matter

Not logos. The certifications that matter for Multifoil.

Every one of these is checkable online. Every one changes something concrete about the job — the survey, the materials, the guarantees, the way the grants land.

  • PAS 2030

    Install quality standard for retrofit measures

    Our teams are certified to the installation standard that grant-funded work is audited against.

  • TrustMark

    The only endorsement scheme backed by the UK consumer body

    Every install is lodged on the TrustMark register so your cover travels with the property.

  • BBA certified

    British Board of Agrément product certification

    Every insulation layer we install is named on the quote and BBA-certified — no unlisted substitutes.

  • CIGA / SWIGA

    25-year insurance-backed cavity + solid-wall guarantee

    If OMEGA is no longer trading in 2049, your guarantee still pays out. Insurance-backed, not hope-backed.

Your numbers

Real numbers. Your postcode. Your home.

Type your postcode below. We pull the latest EPC for your home, blend in this month's Ofgem tariffs, and show you what you're paying this year — and what you could pay after the three upgrades most likely to make sense for a house like yours. No email. No follow-up. Just your numbers.

Step 2 · Property type
Step 3 · When was it built?
Step 4 · How busy is the house?

Indicative — your home, your numbers

Enter a postcode for a refined estimate · Semi-detached · 1945–1979 · medium occupancy · ~21,000 kWh/yr

Dual fuel · Gas + Electric

Your likely EPC gap

Inferred · survey replaces

Now
D
SAP 60/100
After OMEGA retrofit
B
SAP 87/100
A
B
C
D
E
F
G

Inferred from your build era + property type. The free survey replaces this with your home's exact EPC score.

Next · a plan in writingBuild my plan

Your current bill

£2,437

Your 21,000 kWh/yr at Apr 2026 Ofgem cap.

£1,004

Heating · gas

£1,105

Electric

£328

Standing

OMEGA could cut your bill by

£240

A 10% reduction · bill after ≈ £2,197/yr.

Likely grant funding

£2,300–£4,500

ECO4, GBIS, BUS or HUG2 — we file the paperwork.

Payback period

5 yrs grant-funded

19 yrs paid outright. Grants typically halve that.

10-year total saving

£2,400

Same maths, projected forward. Tariffs trend up; this stays conservative.

A free 45-minute survey gives you the real number for your address. In writing. No charge.

Next · a plan in writing

Get the plan in writing.

Five questions. Ninety seconds. We sequence what your home needs first, stack the grants you qualify for, and flag what won't pay back. The plan is yours, whether you book the work or not.

Build my plan
Or call 0800 229 4094

The plan is yours to keep. Take it to two other installers if you like.

Model: NEED 2024 demand medians · Ofgem default tariff cap Apr 2026 (gas 5.9p · elec 27.7p · dual-fuel standing ~£328) · OMEGA install ledger 2026 retrofit-depth medians · ECO4/HUG2/BUS grant tables

OMEGA fleet · 2026 · Q2

Real numbers from real homes, this quarter.

Measured before vs after install with a thermal camera and air-tightness fan test on every property.

64

Multifoil installs · this quarter

£640

Average yr-1 saving · measured

36%

Mean heat-loss reduction

The OMEGA flagship pairing

Wrap your home in multifoil. Power it with solar. The two upgrades that change every other number on your bill.

A well-insulated home uses less electricity. A solar-powered home generates its own. Combine the two and the same kWh of solar generation covers a much bigger share of your annual demand. Payback drops faster than either upgrade pays for itself alone.

Multi-Foil — alone

Annual saving
£640/yr
Payback
3–4 yr
Heat-loss reduction
~35% heat-loss cut

Multi-Foil + Solar PV

Annual saving
£1,740/yr
Payback
5–6 yr
Solar bill-coverage
~70% bill-coverage

Why pairing wins

  • Lower thermal demand from multifoil means a smaller, cheaper solar array can cover a larger share of your year-round electricity use.
  • A wrapped + powered home is the OMEGA flagship combination — every external surface working for you, every kWh self-generated where possible.
  • Single survey, single install schedule, ECO4 stacking on multifoil + Smart Export Guarantee on solar — paperwork handled end-to-end.

The OMEGA Multi-Foil Promise

A 35% heat-loss reduction within 30 days — falsifiable, refundable, written in.

Multifoil reflects radiant heat that conventional fibre absorbs and slowly leaks. Pre-install thermal scan, post-install thermal scan, BBA-certified product, PAS2030 install. We promise a minimum 35% measured heat-loss cut across the treated surfaces.

If we miss

If the year-one measured drop is under 35%, we add additional layers or remediate at zero cost. If you still aren't comfortable, we refund the labour element of the original install.

Honest about who this isn't for

This isn't the right tool for solid-floor insulation (we'd use rigid PIR) or for unventilated cold roofs (we'd fix the ventilation first). We'll tell you on the survey.

The measurable promise

≥35%

Heat-loss reduction · year one

Independently measured before and after install. Written into your quote. Refundable if missed.

Pick your plan

How would you like to buy this?

Three ways to take this on. The middle one is what most homeowners choose — set-and-forget, no surprise bills, no chase. Pick the one that suits.

  1. TIER 1

    Install

    BBA-certified multifoil, fitted by PAS2030 crews.

    From £1,800cash
    £85 / momonthly

    After ECO4 where eligible · over 36 months

    • Pre-install thermal scan + air-tightness test
    • Air-gap measurement at four points per surface
    • 50-yr product guarantee (BBA-backed), 5-yr workmanship
    • Post-install thermal scan + U-value certificate
  2. Most chosen

    TIER 2

    Install + Thermal Care

    Re-measured every year. Vapour seal repaired if anything drifts.

    From £1,800cash
    £93.95 / momonthly

    £85 install + £8.95 Thermal Care · cancel after year one

    • Everything in Tier 1
    • Annual thermal scan to verify the U-value drop
    • Vapour-control tape recheck + reseal where needed
    • Air-gap measurement at four positions per surface
    • Priority callout — 24-hour response
  3. TIER 3

    OMEGA Lifetime

    Care plan + workmanship doubled to 10 years insurer-backed.

    From £1,800cash
    £98.90 / momonthly

    Tier 2 + £4.95 Lifetime · 10-yr insurer-backed cover

    • Everything in Tier 2
    • Workmanship guarantee extended 5 → 10 years
    • Insurer-backed: cover survives if anything happens to OMEGA
    • Annual EPC re-lodgement (keeps your band current)

Tariff Concierge means we route you to the cheapest tariff that fits how you actually use power — not whichever supplier pays us most. We’re an installer, not an energy retailer. Most recommendations land on Octopus, but we run a full market check for every customer.

Multifoil add-ons

Worth adding to your install (or your existing setup).

Pricing is indicative — we re-quote against your actual install on the survey. Bundle pricing if you take more than one.

  • Performance

    Vapour control top-up + reseal

    Tape lifts on movement, especially at rafter edges. We reseal every joint, retest, and certify. The single most-effective add-on for keeping the year-one U-value at year five.

    £149Annual / one-off
  • Performance

    Strongly recommended

    Smart humidity monitor (Wi-Fi)

    Wireless sensor between layers, app on your phone. Multifoil failure is almost always a vapour-control issue — early detection saves the install, the rafters, and the warranty.

    £99 fittedOne-off
  • Comfort

    Acoustic upgrade pack

    Multifoil + an extra mineral-wool layer behind. Halves perceived rain noise on slate and tile roofs without compromising the thermal performance of the foil.

    £189 per surfaceAdd-on at install
  • Capacity

    Loft boarding + folding ladder

    Above the multifoil layer, on stilts so the air-gap detail isn't crushed. Turns the loft into usable storage without sacrificing the install we just measured to 0.18 W/m²K.

    From £449Add-on at install
  • Comfort

    Pipework + tank lagging

    Pairs with the foil layer to complete the thermal envelope. Without it, pipes lose heat faster than the rooms gain it — small spend, large efficiency lift.

    £129Add-on at install
  • Performance

    EPC re-issue + lodgement

    Multifoil reliably lifts EPC by 1-2 bands. We re-assess + lodge it — adds value at sale, opens grant routes that are EPC-gated, lifts mortgage rate brackets on some lenders.

    £89One-off

Want a 2-minute answer first?

Not ready to book a full survey?

Tell us a bit about your place and we’ll come back with specific numbers for your home — no slot to pick, no pressure.

Prefer to talk now? Call free on 0800 229 4094.

Quick enquiry — Multifoil

No full-form-fill, no credit check, no follow-up spam. One call to explain what's possible and what it would cost.

Prefer to talk? Call 0800 229 4094. No cost. No obligation. No pressure.

A local engineer, usually within a fortnight.

Your details stay with us. Never sold. Never shared. Never used to spam you.

Proof in the data

Multifoil — how the numbers stack up

Cumulative £ saved vs install cost for your property type. Drag the chart to scrub through the years.

Ready to see what multifoil would cost on your home?

Free 45-minute home energy survey — thermal imaging, grant check, written plan within 48 hours.

Book your free survey

The plan is yours to keep. Take it to two other installers if you like.

Grants and funding

The grants you can get.

Eligibility changes often, the schemes don’t reward homeowners who fill the forms in themselves, and the paperwork is genuinely tedious. So we file it for you.

We handle the paperwork end-to-end

  • ECO4 + GBIS — insulation, paid direct to us
  • BUS — up to £7,500 off heat pumps
  • SEG — export tariff registration
  • OZEV / EVHS — EV charger grants

You sign once. We submit, evidence, and chase. The grant comes off your final invoice — nothing for you to claim back.

See all grants and funding →
  • ECO4 funding — room-in-roof multifoil is a named eligible measure for benefit-led households

  • ECO4 LA Flex — local-authority extension for households below the income threshold without a benefit

  • Home Upgrade Grant 2 — off-gas-grid properties with shallow rafters where bulk insulation cannot be specified

Common questions

Common questions, answered honestly.

  • Does multifoil insulation actually work, or is it a marketing gimmick?

    Both have been true at different times in the product's history, and the honest answer matters. The early multifoil products in the late 1990s and early 2000s did claim U-values they could not deliver in independent testing — the trade is right to remember that. The BBA-certification regime tightened from around 2010 onwards and the certified products on the market today have published, independently-tested lambda values that are checkable against the cert number. We only fit BBA-certified systems. The other reason multifoil under-performs in the field is bad installation: the reflective mechanism only works with the manufacturer-specified air gap above and below the foil, and a lot of trade installers skip that step because they cannot see the difference once the plasterboard is up. We measure and sign off the air gap before any board goes on. If yours is a job we cannot do that on, we will not fit multifoil at all and we will explain why on the survey.

  • How does multifoil compare to PIR rigid board?

    Different products for different jobs. PIR rigid board (Celotex, Kingspan, EcoTherm) wins where you have full cavity depth available — between rafters in a new build, on a flat-roof warm-roof build-up over the deck, internal wall insulation on a solid wall. Multifoil wins where head-height or build-up depth are the binding constraint — room-in-roof, dormer ceilings, bungalow eaves, internal stud walls that need to keep their service void. We use both, often on the same job. The decision is on the survey, in writing, before you sign anything.

  • How does multifoil compare to mineral wool?

    Mineral wool (Knauf Earthwool, Rockwool, Isover) is the cheapest insulation per kWh saved when you have the depth for it — typically 270mm in a ventilated loft. The trade installs it because it is forgiving, well-understood, and the product cost per square metre is low. It is not the answer when you need a thinner build-up to preserve usable space. A 30–40mm multifoil and a 270mm Earthwool quilt deliver similar U-values; the choice between them is whether you can afford to lose 270mm of head room.

  • What is the air gap rule, and why does every installer mention it?

    Multifoil reflects radiant heat: infrared energy travelling as waves rather than through contact. That mechanism needs a continuous air space (typically 25mm) above and below the foil layer for the reflected energy to return to the warm side without being conducted straight through the next material. Squash the air gap by stapling the foil flush to plasterboard, and the radiant-reflection mechanism becomes a conduction path: the foil now performs like a thin layer of plastic, which is to say barely at all. Every BBA certificate names the required air gap; every reputable installer measures and signs off the gap before plasterboarding. We do.

  • Is multifoil suitable for a cold-roof flat extension?

    Yes, but ventilation is critical and the build-up has to be designed by someone who has done it before. The standard solution we fit is a BBA-certified warm-roof build-up where joist depth is too shallow for 270mm of bulk insulation — most commonly on dormers and rear extensions. Ventilation gaps above the foil are set to the manufacturer's spec, the ridge and eaves details are continuous, and the job is signed off by a PAS2035 retrofit designer if it is grant-funded. We do not fit multifoil into a cold-roof build-up where the ventilation pathway is broken — the trapped moisture risk is real, and the right answer there is a different product.

  • Why do some installers refuse to fit multifoil at all?

    Two reasons, both honest. First, the early-2000s history we mentioned above — a generation of installers got burned by products that did not perform and they have not revisited the certified market since. Second, the labour profile is different from rolling a quilt: it takes longer, the spec is more detailed, the air-gap discipline is the difference between a great install and a bad one, and a lot of trade firms would rather quote the job they can do quickly. We fit it because for the cases above (room-in-roof, bungalow eaves, dormer ceilings) it is the only honest answer, and because we have built the install protocol around the things that go wrong.

  • Does multifoil qualify for ECO4 or other funding?

    Yes. Room-in-roof multifoil upgrades are a named eligible measure under ECO4 for households on a qualifying benefit, and under ECO4 LA Flex for lower-income households below the £31,000 threshold who are not on a benefit. Eligibility depends on EPC band (D–G), council-tax band (LA Flex), and household composition. We check both routes on the same survey visit and where the scheme covers it the install is free; where the measure is part-funded we quote a transparent top-up price before any work starts. Not every multifoil job is grant-funded — a private retrofit on a 1990s loft conversion in a band-E council-tax property typically pays self-funded — and we will tell you which case applies on the survey.

  • Do I need to move out of the house during installation?

    No. Multifoil installs happen room by room from inside, usually finishing each room within a day. We cover floors and furniture, take all waste out at the end of every day, and leave the space dust-vacuumed. The room is sleepable that night. A typical room-in-roof job is 1–2 working days; a multi-room dormer retrofit can run to 3 days.

Where we install

Multifoil across the United Kingdom.

We install multifoil with our own crews across the United Kingdom. Each local team knows the housing stock, the grant routes, and the council-specific flex schemes that apply in their patch.

Ready to start?

Free 45-minute home energy survey. Written plan within 48 hours. Zero pressure.

The plan is yours to keep. Take it to two other installers if you like.

25-year product warranty. 5-year workmanship guarantee. Both insurer-backed. If we vanished tomorrow, your cover still pays out.

Book a surveyCall free